At designing the reconstruction of the sports arena lighting, we employed a combined scheme of the upper and side lighting. Since the height of overlap is limited and the width of the playground is 30 meters, to limit the level of blindness we had to limit the opening angle of the spotlight.
Customer: Sport Palace
Location: Kiev
Implementation: 2011
Equipment: SBP s.P.a, Technointer
Lighting design: Technointer Group
Electric project: Technointer Group
Switchboards: Technointer Group
Control system: Technointer Group